Hi, thank you for visiting my portfolio. 
I am not a photographer but I love the photography. My modest portfolio is an open window to my souvenirs.
Thanks to my professional experience I could travel and discover a few countries. The world is so large, my life is so short!  

Drilling & Workover supervisor / Drilling engineer with 25 years of experience in O&G and Geothermal Energy covering geology and drilling engineering . The multidisciplinary positions include offshore and onshore development / exploration wells in many countries working for the main oil and gas operators. A solid multi-disciplined experience with a commitment for challenging HPHT projects proves a high interest in the reservoir and drilling engineering. Very good language skills (fluent English, French-Spanish bilingual) with experience supervising all drilling operations from spud to completion and a serious HSE approach complete an operational and flexible profile.

Professional Experience:

September 16 –  To day
Worked on a 14/14 rotational basis as well-site drilling supervisor, providing well engineering and supervisory for onshore Project,  Geothermal projects . Responsible to issue daily drilling reports, supervise all drilling operations including casing running, cementing, mud engineering, Logging, Directional/MWD, Well testing and completion on land rig. Strong HSE commitment establishing the target at “ZERO” accident or incident.
Client: GPC IP / SEER / DALKIA (EDF Groupe)/SETBO/CFG/ES/AGEPP    

Nov 13 – Dec 15
Responsible to supervise all Workover and Pulling well site operations for Oil producer and Injection Wells onshore in France including land rig and rigless interventions:  repair and run new completion, Sucker rod pumping, Electrical submersible pumps, fishing job, casing recovery, well abandonment, acid job, stimulation, cased hole logging, casing perforating job, coiled tubing, hole cleaning...In charge to issue daily reports, track daily cost AFE, review operational programs, represent the operator with a strong HSE commitment establishing the target at ZERO accident and incident.
Client: Vermilion REP



Sept 13 –  Oct 13
Worked on a 7/7 rotational basis as well-site night drilling supervisor, providing well engineering and supervisory for onshore Project, in the Paris Basin, exploration vertical well for oil. Responsible to issue daily drilling reports, track daily cost, review operational programmes, supervise all drilling operations including casing running, cementing, mud engineering, Logging, MWD, on land rig. Strong HSE commitment establishing the target at “ZERO” accident or incident.
Client: Geopetrol S.A



Mai 13 –  August 13
Worked on a 14/14 rotational basis as well-site drilling supervisor, providing well engineering and supervisory for onshore Project, in the Paris Basin, Geothermal project ( 2  deviated wells  1 injector + 1 producer). Responsible to issue daily drilling reports, track daily cost, review operational programmes, supervise all drilling operations including casing running, cementing, mud engineering, Logging, Directional/MWD, Well testing and completion on land rig. Strong HSE commitment establishing the target at “ZERO” accident or incident.
Client: GPC IP / IDEX


April 13 –  Mai 13
Contracted as Night Toolpusher to lead night drilling crew for a workover job on an offshore production platform in North of Spain for Repsol.
Client: Gessal / REPSOL



Jun 11 –  Oct 12
Consultant for Halliburton and Gessal (Spain) – Day / Night Drilling supervisor
Worked on a 28/28 rotational basis as well-site day and night drilling supervisor, providing well engineering for onshore Project, in north of Spain, CO2 storage. Responsible to issue daily drilling reports, to validate operational programmes, to supervise all drilling operations including casing running, cementing, mud engineering, Logging, Directional/MWD, Well testing and Abandonment on last generation land rig. Active role to coordinate logistic ( tools and personnel call out), in direct contact with services companies and providers optimizing standby and reducing cost. In charge to capture drilling events and lessons learnt to improve well planning. Witness Rig  commissioning period evaluating rig conditions to spud new wells. Reporting to drilling superintendent in Madrid. Strong HSE commitment establishing the target at “ZERO” accident or incident.
Client: Geostock for ENDESA


Dec 10 –  Mar 11
Consultant (Rio de Janeiro) – Drilling Engineer
Responsible of the preparation of the drilling program, the day-to-day follow-up of the operations and the compilation of the EOWR. Perform revisions of the well basis of design and the programs provided by the individual services lines. Prepare AFE. Coordinate technical meetings including the DWOP. Capture, well data including lessons learned. Report to drilling Manager. Offshore wells ( semisub and jackup). Office position in  Brazil.
Client: OGX

Nov 08 – Sep 10
Consultant for Baker Hughes Integrated Operations (Mexico) – Drilling Engineer (Night drilling supervisor)
Worked a 28/28 day rotation schedule as well site drilling engineer  including night drilling supervision. Offshore, shallow water HPHT  wells in Mexico for Pemex.; providing  well-site engineering and supervision for a full integrated operation with technical and administrative assistance to the Day Drilling Supervisor during the execution of the drilling program; providing general Drilling Engineering support to rig drilling personnel  and supervising all services lines.
Client: Pemex

Jan 08 – Oct 08
Working as Pore Pressure Engineer (undertaken by Geoservices). Offshore, deep and shallow water HPHT exploration wells. Pore pressure and fracture gradient computations (equipoise software) from WL or/and LWD data and reassessed using mud logging approach (drilling parameters and gas events). Very challenging projects with a direct and continuous contact with drilling supervisors.
Clients: BP (Azerbaijan), Total (Cameroon), Addax (Cameroon)

Dec 03 – Dec 07
Geoservices (international) – Senior Data Engineer, Unit Manager and technical support
Worked a 28/28 day rotation schedule as Unit manager supervising well site team and unit equipped with new advanced mud logging system developed by Geoservices. The position consisted in:
-making marketing presentations
-preparing project with pre-job rig visit
-attending the pre-drill / pre-spud meetings
-making the unit rig up and rig down
-offering continuous technical field support
-leading mud logging crew.
-providing advanced well monitoring and drilling events logging using last generation of acquisition system.
-providing Engineering (Drilling Engineering, Formation Evaluation, Reporting / LOGS)
Clients: BP ( Angola, Brazil, Turkey), Statoil ( Venezuela), Encana ( Brazil), Wintershall (Brazil), Total (Angola)

Oct 02 – Nov 06
Geoservices (Paris)– Research and development position
Technician responsible for developing new mud logging system testing hardware and software. The main task was to operate the new system in real conditions and upgrade new features and applications for drilling engineering and formation evaluation.

Jan 98 – Sep 02
Geoservices (International) – Data Engineer
Worked a 28/28 days rotation schedule as Data engineer for Geoservices.
Well monitoring from Mud Logging data. Kick detection. Gas Detection and Interpretation- Calculation of Hydraulics (Theory and Optimization). Overpressure (Causes and Detection). Reporting to the Well Site Geologist Responsible to issue Final Well Reports from Mud logging services.
Client: Agip (Congo), Total (Congo), Repsol (Spain), Elf (Nederland, Gabon, Angola), Chevron (Angola), Perenco (Gabon)

May 97 – Dec 97
Geoservices (International) – Initial training as Mud Logger
Worked a 28/28 days rotation schedule as Mud Logger for Geoservices.
Concept of Services, cuttings collection and treatment, Samples descriptions, well monitoring, Lag Time calculation, Mudlog Drafting, Hydrocarbon Detection, Gas Detection and Analysis - Drilling Parameters, their Acquisition and Treatment. Mud logging Sensors maintenance. - Shift Work - Unit Maintenance - H2S Awareness. Reporting to the Well Site Geologist
Clients: Repsol (Spain), R. Poulenc (France).


Professional Training, certificates and courses:

IWCF Well Control Certificate. Surface stack, Supervisor level (Pau / September 2017 )
IWCF Well Control Certificate. Surface stack, Supervisor level (Pau / September 2015 )
IWCF Well Control Certificate. Surface stack, Supervisor level (Pau / September 2013)
IWCF Well Control Certificate. Surface stack, Supervisor level (Malaga 2011) 
Mentoring and Coaching (BHIO, Ciudad del Carmen, Mexico 2010)
IADC Rig Pass ( IADC, Villahermosa, Mexico 2008
Pore Pressure Engineering  (Geoservices, Dundee, UK 2008)
IWCF Well Control Certificate. Combined land and subsea, Supervisor level (IFP, Pau 2008)
BOSIET including HUET and EBS. Opito approved ( O.T.I, Baku 2005 )
Safety F.O.C.U.S Training ( Randy Smith, Malta 2004)
HUET – BOSIET (M&O Sampling, Macae 2003)
Introduction to Tecdrill drilling software ( Techdrill, Paris 2003)
Basic reservoir engineering for geoscientist (Geoservicew, Dundee 2003)
BOSIET (Opito Approved including Norvwegian induction 2000)
Advanced Mudlogging, data and drilling engineering (Geoservices, Paris 1997)
Mudlogging Initial training (Geoservices, Paris 1997)

Education:
1996
University  Master Degree in Geological Sciences (Maitrise, Montpellier UFR II , France)
1993
University Degree in Sciences ( DEUG A, Bourges UFR, France)




Experience as Photographer, Publications:
Back to Top